Show a traffic light or progress bar

You can color a number field green, amber or red by two thresholds, or show it as a progress bar.

A display rule changes only what you see on the work item and in lists. Search, sorting and exports keep the number.

Before you begin​

  • Jira permission: Jira admin (the Administer Jira global permission).

  • FieldCraft: installed, with an active license.

  • Field type: Transition Count, Time in Status, Time Between, Field Change Count, Calculated Metrics, Rollup, Jira Expressions - Number or Parent Field - Number.

Countdown colors its value on its own, so you don't need a display rule for it. Text, date and user fields have none.

Show a traffic light​

  1. Open the field's configuration page. See Configure a field.

  2. Under Display, select Traffic light: green, amber or red by two thresholds. FieldCraft fills in 3 for amber and 5 for red.

  3. Select Lower is better if you want small values green, or Higher is better if you want large values green.

  4. Enter the two thresholds. If the field offers several units, such as working days and working hours, select one in In.

    The Display section with Traffic light selected, Lower is better, Amber from 3, Red from 5 and the preview under 3: green, 3 to 5: amber, 5 working days and more: red

  5. Check the preview strip below the thresholds, and select Save.

Result: You see the value in a green, amber or red lozenge on the work item.

Lower or higher is better​

OptionThresholdsPreview strip
Lower is betterAmber from and Red from. Red starts at or above amberunder 3: green, 3 to 5: amber, 5 transitions and more: red, for a Transition Count
Higher is betterAmber below and Red below. Red starts below amberbelow 50: red, 50 to 80: amber, 80 % and more: green, for a % done Rollup

Use Lower is better for durations and counts of rework. Use Higher is better for progress, such as a % done Rollup.

When you switch the option, FieldCraft swaps your two numbers.

You can enter decimals with a point or a comma.

Show a progress bar​

  1. Open the field's configuration page.

  2. Under Display, select Progress bar, full at a number you choose.

  3. In Full at, enter the value that fills the bar. The default is 100.

  4. Select Save.

Result: You see a progress bar next to the value on the work item.

The bar turns green once full. Values above Full at show a full bar.

How it looks​

On the work item, you see the lozenge or the bar next to the value.

In lists, you see a colored circle or a ten-step text bar such as β–°β–°β–°β–±β–±β–±β–±β–±β–±β–± before the value.

If a field is empty, you see no color or bar.

If you can't save​

MessageWhat to do
Set both thresholds.Enter a number in both threshold boxes
Red must start at or above amber.With Lower is better, make the red number the larger one
Red must start below amber: red below a smaller number than amber.With Higher is better, make the red number the smaller one
Set the number at which the bar is full.Enter a number above 0 in Full at